top of page
Learn About Our Projects
Bridge Inside

Truss Bridge

March 30, 3030

Get In Touch
Bridge Over Water

Suspension Bridge

March 30, 3030

Get In Touch
Road and Bridge Network

Highway Junction

March 30, 3030

Get In Touch
CONTACT

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Pete Pitilis Jr. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.​

bottom of page